Title | Author(s) | Publish date |
---|---|---|
Building codes: A historical perspective Document: BOCA, Pages: 14-16 |
Albert Harness | 04/1995 |
The growing problem of mold Document: The Code Official, Pages: 38-49 |
Susan Kite | 05/2002 |
NRCA reports on roofing problem areas Document: BOCA, Pages: 2-3 |
Thoams Smith | 10/1991 |
Engineered lumber's strengths Document: BOCA magazine, Pages: 2-7 |
Elizabeth Padjen | 03/1998 |
Inland high wind construction issues for the central and eastern United States Document: BOCA magazine, Pages: 20-24 |
Robert McCluer | 09/1997 |
Legal aspects of code administration Document: Book, Pages: 192 |
BOCA / ICBO / SBCCI | |
Roof wind uplift anchorage is required in your town (or should be) Document: BOCA magazine, Pages: 2-4 |
Robert McCluer | 07/1997 |
ASCE 7-95 new provisions for calculating wind loads Document: BOCA magazine, Pages: 17-21 |
K Mehta; P Horn | 01/1997 |
FEMA/BOCA cooperative projects promote hazard mitigations Document: BOCA magazine, Pages: 42-44 |
03/1997 | |
Fire retardant treated plywood Document: BOCA magazine, Pages: 6-7 |
BOCA | 03/1989 |
State of the art hurricane wind research programs enable engineer to design safer roofing systems Document: BOCA magazine, Pages: 48-50 |
Gill Harris | 05/1995 |
NRCA negotiates settlement agreement with OSHA Document: BOCA magazine, Pages: 10 |
05/1995 | |
Woods in construction Document: BOCA magazine, Pages: 24-31 |
S Francis; D Collins | 03/1995 |
HVAC Systems and Equipment Document: Report 93-49, Pages: 2 |
BOCA Evaluation Service | 07/1994 |
Waterproofing Membranes Document: Report 93-22, Pages: 4 |
BOCA Evaluation Services | 07/1994 |
Dampproofing Membranes Document: Report 93-4, Pages: 2 |
BOCA Evaluation Services | 07/1994 |
Fire detection/protection systems - HVAC systems & equipment Document: Report 93-3, Pages: 3 |
BOCA Evaluation Service | 07/1994 |
Roofing systems - Dow Corning Corp. Document: Report, Pages: 3 |
Dow Corning Corp. | 10/1990 |
Technical advisory committee considers attic ventilation issues Document: BOCA magazine, Pages: 34-35 |
03/1994 | |
Fire retardant trusses at risk Document: BOCA magazine, Pages: 2-3 |
03/1994 | |
NRCA Reports on Roofing Problem Areas Document: BOCA magazine, Pages: 2- |
09/1991 | |
Random City Document: BOCA magazine, Pages: 22- |
Harris, Gil | 07/1993 |
Model Code Wind Construction Needs Document: BOCA magazine, Pages: 2- |
07/1993 | |
Performance of Roof Truss Systems During Hurricane Andrew Document: BOCA magazine, Pages: 22- |
Meeks, John; Riba, Ramon; Triche, Michael | 03/1993 |
FRT effects of elevated temperature and guidelines for design Document: BOCA magazine, Pages: 2-4 |
Jerrold Winandy | 11/1990 |
Hurricane Andrew Document: BOCA magazine, Pages: 40-51 |
11/1992 | |
The Case of the Sliding Roof Document: BOCA magazine, Pages: 30-32 |
Walsh, Martin P. | 01/1993 |