To obtain a copy of a specific publication, users should contact the publication's publisher directly.
Abstract
This addendum updates references to the newly approved ANSIIBIFMA Ml.1-2011, ANSIIBIFMA Xl.1-2011 and ANSIIBIFMA e3-20l I in Sections 8 and Section 11. It deletes all of Appendix E, making reference to the relevant material in Section 8. However, all of the requirements remain the same as those in the current version of Appendix E except the acetaldehyde and xylene requirements are updated for consistency with ANSIIBIFMA e3-201 l, CA OEHHA guidance and the 2010 requirements of the CDPH Standard Method vl.1.
This addendum updates references to the newly approved ANSIIBIFMA Ml.1-2011, ANSIIBIFMA Xl.1-2011 and ANSIIBIFMA e3-20l I in Sections 8 and Section 11. It deletes all of Appendix E, making reference to the relevant material in Section 8. However, all of the requirements remain the same as those in the current version of Appendix E except the acetaldehyde and xylene requirements are updated for consistency with ANSIIBIFMA e3-201 l, CA OEHHA guidance and the 2010 requirements of the CDPH Standard Method vl.1.
Date
1/2013
1/2013
Author(s)
ASHRAE
ASHRAE
Page(s)
1-44
1-44
Keyword(s)
energy; electrical; cost; loads
energy; electrical; cost; loads