NEW! Know your rights. Read the roofing contractors guide to an ICE visit.

ASHRAE Guideline 0-2013-The Commissioning Process

To obtain a copy of a specific publication, users should contact the publication's publisher directly.

Abstract
The latest version of Guideline O continues in demonstrat­ing best practice principles for applying the whole-building commissioning quality process in facility elements. Guideline 0 outlines the process for achieving, validating, and document­ing the performance of facility elements in meeting the defined objectives and criteria of the Owner. This quality process extends through all phases of new or major renovation proj­ects, from predesign to owner occupancy and operation, with tasks during each phase to ensure verification of design, con­struction, and operator training meeting the Owner's Project Requirements (OPR). Guideline O describes the overall com­missioning process in providing a uniform, integrated, and consistent approach for commissioning facilities.
Date
1/2013
Author(s)
ASHRAE
Page(s)
1-72
Keyword(s)
assemblies; commissioning; sampling


Note: Documents in this section are provided as Adobe Acrobat PDF files. In order to print and view PDF files, the Adobe Acrobat Reader software/plugin, which runs on Microsoft Windows, Macintosh, OS/2 and various versions of UNIX, must be installed on your computer. Adobe Acrobat Reader is available for download as freeware from Adobe Acrobat's website. Please note that the resolution of on-screen versions is not as high as printed versions of PDF files.

Advertisement

Subscribe for Updates Join 25,000+ roofing professionals following NRCA

Subscribe to NRCA