To obtain a copy of a specific publication, users should contact the publication's publisher directly.
Abstract
The application of mod bit membranes, particularly during cold weather, may require special techniques to prevent the stiffening of materials, inadequate adhesion, and to ensure that the proper bitumen temperature at the point of application. By followiong proper procedures and exercising the recommended precautions, application can progress more efficiently and at a higher quality of installation.
The application of mod bit membranes, particularly during cold weather, may require special techniques to prevent the stiffening of materials, inadequate adhesion, and to ensure that the proper bitumen temperature at the point of application. By followiong proper procedures and exercising the recommended precautions, application can progress more efficiently and at a higher quality of installation.
Date
7/1996
7/1996
Author(s)
Canadian Roofing Contractor Association
Canadian Roofing Contractor Association
Page(s)
Keyword(s)
application guideline; hot asphalt; modified bitumen roll roofing; storage; handling; cold weather precaution
application guideline; hot asphalt; modified bitumen roll roofing; storage; handling; cold weather precaution