Abstract
The intent of this paper is to discuss how existing deleterious conditions were assessed and how the final reroofing specifications were determined. There is also a discussion of the various repair and reroofing options that were explored, as well as the methods of quality control followed during construction to ensure a watertight, warrantable, long-term roofing system.
The intent of this paper is to discuss how existing deleterious conditions were assessed and how the final reroofing specifications were determined. There is also a discussion of the various repair and reroofing options that were explored, as well as the methods of quality control followed during construction to ensure a watertight, warrantable, long-term roofing system.
Date
5/1994
5/1994
Author(s)
Tom Tjelmeland; Kurt Tjelmeland
Tom Tjelmeland; Kurt Tjelmeland
Page(s)
201-206
201-206
Source
Oak Ridge National Lab
Oak Ridge National Lab
Keyword(s)
built up roofing; removal; recover; blistering; conductance test; infrared;
built up roofing; removal; recover; blistering; conductance test; infrared;