To obtain a copy of a specific publication, users should contact the publication's publisher directly.
Abstract
In the fall of 1985, NRCA published a document entitled, "Quality Control in the Application of Built-up Roofing." This document reviewed workmanship, test cuts and the examination procedures to be followed during membrane construction. This article examines and gives conclusions regarding this document.
In the fall of 1985, NRCA published a document entitled, "Quality Control in the Application of Built-up Roofing." This document reviewed workmanship, test cuts and the examination procedures to be followed during membrane construction. This article examines and gives conclusions regarding this document.
Date
2/1987
2/1987
Author(s)
Jim Koontz
Jim Koontz
Page(s)
48-54
48-54
Source
Roofer Magazine / D & H Pub
Roofer Magazine / D & H Pub
Keyword(s)
test cut; workmanship; interply tolerance; quality control
test cut; workmanship; interply tolerance; quality control