To obtain a copy of a specific publication, users should contact the publication's publisher directly.
Abstract
This document contains guidelines for the installation of roof mounted outdoor air conditioner equipment as developed and agreed upon by the Air-condition- ing & Refrigeration Institute (ARI) and Air-Conditioning Contractor's National Association, Inc. (SMACNA). The purpose of these guidelines which cover curb and roof penetrations and sealings is to set forth good construction practices. This guideline supersedes ARI Guideline B-1986. These guidelines cover instructions on the interface between the roof & the location at which the unit, piping, electrical wiring or sheet metal ductwork pass through the roof.
This document contains guidelines for the installation of roof mounted outdoor air conditioner equipment as developed and agreed upon by the Air-condition- ing & Refrigeration Institute (ARI) and Air-Conditioning Contractor's National Association, Inc. (SMACNA). The purpose of these guidelines which cover curb and roof penetrations and sealings is to set forth good construction practices. This guideline supersedes ARI Guideline B-1986. These guidelines cover instructions on the interface between the roof & the location at which the unit, piping, electrical wiring or sheet metal ductwork pass through the roof.
Date
6/1997
6/1997
Author(s)
SMACNA/ARI
SMACNA/ARI
Page(s)
21
21
Keyword(s)
guideline; roof mounted equipment; HVAC; installation; SMACNA; ARI
guideline; roof mounted equipment; HVAC; installation; SMACNA; ARI