Abstract
This article was adapted from a persentation given by Steve Kruger, president of L E Schwartz & Son, Macon GA; Helene Hardy Pierce, director of technical services for TAMKO Roofing Products, Joplin, MO; and Carl Cash, principal at Simpson, Gumpertz & Heger, Inc. Arlington, MS.
This article was adapted from a persentation given by Steve Kruger, president of L E Schwartz & Son, Macon GA; Helene Hardy Pierce, director of technical services for TAMKO Roofing Products, Joplin, MO; and Carl Cash, principal at Simpson, Gumpertz & Heger, Inc. Arlington, MS.
Date
7/1996
7/1996
Author(s)
Page(s)
16-17
16-17
Keyword(s)
design liability; reroofing design; contract error; lack of stanards
design liability; reroofing design; contract error; lack of stanards