To obtain a copy of a specific publication, users should contact the publication's publisher directly.
                        Abstract
Code changes may benefit SPF installers. For the first time, continuous air barrier systems will be required by ASHRAE under Addendum z to Standard 90.1-2004. This proposed new standard has been in public review since November 2005 and should be adopted in 2006 -- this is the first ASHRAE standard to establish performance requirements for air leakage of the opaque building envelope
                    
                    Code changes may benefit SPF installers. For the first time, continuous air barrier systems will be required by ASHRAE under Addendum z to Standard 90.1-2004. This proposed new standard has been in public review since November 2005 and should be adopted in 2006 -- this is the first ASHRAE standard to establish performance requirements for air leakage of the opaque building envelope
                        Date
4/2006
                    4/2006
                        Author(s)
Tom Harris
                    Tom Harris
                        Page(s)
17-20
                    
                    17-20
                        Keyword(s)
air barrier; air leakage; SPF system
                air barrier; air leakage; SPF system