Access the Leadership and Workforce Development Catalog.
News July 29, 2021

How can you keep equipment running smoothly during the summer?

Summer heat can be physically stressful for construction equipment and intensify wear and tear, according to www.forconstructionpros.com. Maintenance during this peak construction period is key.

Following are maintenance best practice tips to help keep equipment running smoothly and productively on worksites and ensure your employees stay safe.

Daily inspections are essential, and you especially should look for these issues:

  • Coolant and oil: Ensure the machine has the proper coolant level, coolant/water ratio and oil levels recommended by the manufacturer.
  • Grease: Use thicker grease because hot temperatures reduce the adhesive properties of grease. Consult the equipment manual to find what type of grease is best for the machine, where to grease and how often.
  • Belts and hoses: Discolored hoses and loose belts offer the first hint of overheating, so be sure to inspect them.
  • Hydraulic system and air filters: During an equipment inspection, check air filters and check for signs of possible hydraulic leaks, excess oil and grease, leaks around seals and loose bolts.
  • Tires: Check tire pressure regularly as hot conditions weaken tires and may cause a blowout.
  • Brakes: Hot summers can cause loss of brake friction because brake components cannot absorb the additional heat.
  • Cooling system: Check that the radiators and inlets and outlets of the cooling system are free of debris.

Along with daily inspections, you should set a schedule for a deeper maintenance routine that covers hydraulic and engine oil levels, transmission oil, radiator coolant, tire treads, battery, brakes and other items.

Additionally, working with an equipment maintenance service provider that specializes in equipment repair and service can protect your equipment investment and your employees.

Advertisement

Subscribe for Updates Join 25,000+ roofing professionals following NRCA

Subscribe to NRCA